|
Banner News
May 2004
Some of the recent projects related to Banner that have been
completed include:
- Moving to a new Unix machine and upgrading to Oracle 9i.
- Streamlining the damage billing process incorporating the
Infacta mass emailing system and web display
- Redesign of the payroll checks to provide detail on benefits
that Eckerd pays for the employee.
Some of the projects that are currently underway include:
- Improved Faculty/Staff/Department Directory. The goal of this
project is to enhance the current on-line directory and outline
procedures for maintenance of the related information.
- Course Catalog. As the new 2-year catalog is being developed,
we are determining the best ways to incorporate Banner in the
maintenance and redisplay of the information.
- Development of processing to provide deposited students Eckerd
emails and access to the ECWeb resources.
- Departmental web pages are being either created or reviewed.
The current aim of this project to towards needs to newly deposited
students.
Projects that are projected for the near future. Look for
updates on these:
- Banner 6.x upgrade - Summer 2004
- Web for Admissions (Banner) - Summer 2004
- Web-based credit card payments (TouchNet) - Fall 2004
- Web-based eBill (TouchNet) - Fall 2004
- Debit-card system - Winter 2005
- Web-based eCheck (TouchNet) - TBA
- Web-based installment payment plans (TouchNet) - TBA
|